Evaluating Mould Machining and Assembly as One Process
Evaluate the connection between mould machining and assembly, with practical questions about drawing revisions, mating components and the manufacturing records relevant to your order.
Read more
| Product Size | Hourdis A: 518 × 80 × 200 mm; Hourdis B: 518 × 160 × 200 mm. Hollow-block dimensions not specified. |
| Height/Thick. | Hourdis A/B: 200 mm; hollow-block height not specified. |
| Cavities/Cycle | Hourdis A: 20 pieces per mould (518 × 80 × 200 mm); Hourdis B: 12 (518 × 160 × 200 mm). Hollow-block layout unconfirmed. |
| Machine Brand | QUADRA |
| Machine Model | Q10 |
| Pallet Size | 1200 × 1150 mm (Hourdis order only; separate hollow-block order unconfirmed) |
| Product Type | Hollow blocks and Hourdis blocks |
Evaluate the connection between mould machining and assembly, with practical questions about drawing revisions, mating components and the manufacturing records relevant to your order.
Read moreConsider replaceable forming components during mould selection. Review part identification, access and matching requirements before assuming that a whole tool can be refurbished.
Read morePrepare your product and machine information. Let’s review the tooling.
Send the finished block drawing and dimensions, machine brand and model, pallet dimensions and the mould mounting details. For a replacement, include photos or drawings of the existing mould.
The review connects the block design with the receiving machine, pallet, mounting arrangement and available forming space. Share the relevant machine and mould drawings so the interfaces can be checked before a proposal is confirmed.
Select your project purpose and describe the current tooling or the block shape you want to produce. Existing mould photos and a dimensioned product drawing help the team identify the information still needed.
Confirm the approved block drawing, cavity arrangement, machine interfaces and agreed mould specification. Include any project changes in the enquiry so the proposal can be reviewed against the latest requirements.